Design Validation
In case you want to validate your design
or crosscheck your assumptions, we can
also provide you with standard up peak
traffic analysis.
Send us the data (click
on Excel for the format)
and we will run the simulation and send
you the results in 5 working days from
receipt of the data.
This report will only give the standard
up peak results with respect to the traffic
handling parameters of your design and
will not include recommendations.
Caution:
This report will not be a substitute for
the direct involvement and recommendations
of an elevatoring expert. Keep in mind
that the actual traffic handling ability
of your elevators could vary by virtue
of variation in assumptions, location
within the building, positioning of the
lobbies, equipment characteristics etc.
Any analysis beyond the standard
up peak requires extensive discussion
to establish the other variables.
If you require further details, please
contact us or refer our DESIGN
STAGE services.
Vertical System Assessment
| 1. |
New
Equipment Assessment |
| 2. |
Under Service Equipment
Assessment |
| 3. |
System Adequacy Assessment |
Interventions
| 1. |
Dispute
Opinion |
| 2. |
Incident Opinion
|
Training
| 1. |
We
conduct training for lift operators,
security personnel etc who might
be involved in handling day to day
aspects of the lift and escalator
operations.
This training will clearly instruct
the attendees that the session is
not intended to make them experts
and the technical aspects are to
be left to the specialists.
|
| 2. |
We
also conduct educative sessions
for children with focus on safe
usage of elevators and escalators. |